Traffic Delays

Finally, on the way to work today, they started the resurfacing of the trans-Canada from Regina to Emerald Park. It is about time this project got started as the highway is terrible. I’m just going to have to get used to the delays for hopefully only a week and then everyone can enjoy the fresh pavement. Some of the problems with the road were ruts, and cracks, pot-holes, and in some places it wasn’t very level causing jumps. I wonder if the police will come back afterwards since speeding could be an issue on the flat surfaces??